Which Delivery Term Code and Offer Release Code fit this shipment?

Answer four questions about a shipment to see the Delivery Term Codes and Offer Release Codes whose definitions in the fit it, and whether it needs a .

Estimate only — the governs. The assigns the codes on each line.

Describe the shipment

Who moves the materiel?
Where does the U.S. Government hand it over?
What does the shipment include? Select all that apply.
Does the purchaser want a Notice of Availability before the shipment is released?

Codes that fit

Choose who moves the materiel and where it is handed over to see the codes.

Before relying on these codes

  • The purchaser's shipping method drives the codes: who moves the materiel, and where the U.S. Government hands it over.
  • These are typical paths, not defaults. The manual sets no default code, and more than one code can fit a line.
  • A is rarely settled for good when the is signed. The assigns it during case development and changes it by amendment in coordination with the purchaser.
  • No transportation rates are shown here.

Who sets the codes

“During case development, the Implementing Agency’s (IA) role in determining and assigning the proper DTC to each line on the Letter of Offer and Acceptance (LOA) is critical to successful materiel shipment.”

SAMM C7.4.2

“A purchaser may specify a preferred DTC in the Letter of Request (LOR).”

SAMM C7.4.1

“Following case implementation assigned DTCs should be updated through an Amendment as required in coordination with the purchaser.”

SAMM C7.4.2

The two codes go together:

“This code specifies notification requirements prior to shipment and must be compatible with the Delivery Term Code.”

SAMM Figure C5.F11

Sources

Checked against the manual: 11 September 2026.