FMS EdgeFMS Edge — home

Tools

Transportation charge calculator

Estimate the transportation charge a adds to a materiel line on a , using the percentages in Table C9.T4A and the line rule in Table C9.T4.

Estimate only — the governs. The assigns each line's code and prices the case.

Calculate the charge

Line type

“For blanket order lines – the DTC percent.” (SAMM Table C9.T4)

Shipping from
Delivered to (rate area)

This code has one rate for every destination.

Result

Percentage
2.75%
Estimated transportation charge
$2,750.00

Applied to the whole line value.

What this code means: DTC 2

Where delivery ends (LOA Information):

“To a CONUS inland point (or overseas inland point when the origin and destination are both in the same geographic area)”

SAMM Figure C5.F10

Table C9.T4A:

“a) Inland origin to inland destination within the continental United States (CONUS)/Canada (except Newfoundland and Labrador) b) Inland origin to inland destination within a foreign country other than Canada”

SAMM Table C9.T4A

Notes on the table

“At the time of preparation of the Letter of Offer and Acceptance (LOA), if it is known and authorized that materiel will be shipped via a SAAM, the cost should be included as a line on the case and priced as an estimate of the cost. This shipment will cite the line on the case for reimbursement.”

SAMM Table C9.T4A

“Delivery Term Codes 3 and 6 were eliminated in 2010 and should not be used when pricing LOAs.”

SAMM Table C9.T4A

“Note: effective 14 Aug 2020, BPC Title 10-funded cases will not be assessed the Transportation Surcharge.”

SAMM Table C9.T4

Which DTC applies?

Answer the questions to see the code whose definition fits the move. The Implementing Agency, not this page, assigns the code.

Is this a repair LOA, with materiel coming to the United States for repair and going back?

Answer the questions above to see a code.

Who sets the code:

“During case development, the Implementing Agency’s (IA) role in determining and assigning the proper DTC to each line on the Letter of Offer and Acceptance (LOA) is critical to successful materiel shipment.”

SAMM C7.4.2

“A purchaser may specify a preferred DTC in the Letter of Request (LOR).”

SAMM C7.4.1

“Following case implementation assigned DTCs should be updated through an Amendment as required in coordination with the purchaser.”

SAMM C7.4.2

Sources

Checked against the manual: 11 September 2026.