data is an estimate of cost and availability for planning. It is not an offer to sell and cannot be used to prepare a . A is the U.S. Government's offer to sell, built on the purchaser's specific requirements; once the purchaser signs it, it is an , and it is implemented when any required has been received and the implementing transactions have occurred.

THREE ANSWERS TO A LETTER OF REQUEST: HOW BINDING IS EACH? fmsedge.com What is a Letter of Request in Foreign Military Sales? AN LOR FOR P&A IS ANSWERED WITH AN ESTIMATE AN LOR FOR AN LOA IS ANSWERED WITH THE OFFER Rough Order of Magnitude (ROM) SAMM C5.4 · C5.4.1 · Table C5.T7 Price and Availability (P&A) SAMM C5.5 · C5.5.1 · C5.5.2 · C5.T8 Case Development and LOA Preparation in Foreign Military Sales Letter of Offer and Acceptance (LOA) SAMM C5.6.1 · C5.6.2 · Table C5.T9 to buy, request an LOA ANSWERS WHAT IT IS COMMITS THE USG? VALID FOR PREPARING AN LOA? RESPONSE CLOCK LORs for P&A, except international competitions and BPC LORs for P&A for international competitions and BPC a formal LOR for an LOA “an initial, non-binding cost estimate intended for planning and feasibility assessment”; data “for budgetary/ planning/review purposes only” “estimates of cost and availability”; “for planning/review purposes only”; “may not be adequate for budgetary purposes” “the legal instrument used by the USG to sell defense articles, defense services including training, and design and construction services” No “does not constitute a commitment for the USG to offer for sale” No “does not constitute a commitment for the USG to offer for sale” It is the offer. When implemented, it “becomes an official tender by the USG” No “not valid for the purpose of preparing an LOA” No “not valid for use in preparing a Letter of Offer and Acceptance” * It is prepared from LOA data: “The data compiled for a LOA is referred to as LOA data (LOAD).” “The IA will respond within 30 days using the ROM memorandum template” — see SAMM C5.5 How long does it take to get a Foreign Military Sales Letter of Offer and Acceptance? Case development standard: 85% of documents within A blanket order, CLSSA 30 days B defined order 90 days C defined order, extenuating factors 130 days D Building Partner Capacity † 60 days A, B, C clock: LOR Actionable to Offer; Category D stops at BPC Wait * For international competitions the USG may respond to an LOR for P&A with a P&A providing LOA data (SAMM C5.5.2.1). † Category D stops at BPC Wait, not at offer (Table C5.T9). FMS Edge an estimate: no commitment · the offer · only if the partner goes on to buy fmsedge.com · Current as of 26 October 2026 · SAMM C5.4 · C5.5 · C5.6 · C5.T9

A Letter of Request can be answered three ways. A Rough Order of Magnitude estimate and Price and Availability data commit the U.S. Government to nothing; only the Letter of Offer and Acceptance is the offer, and to buy, the partner must request one.

How binding is the answer: ROM, P&A, LOA · Current as of 26 October 2026 · SAMM C5.4 · C5.5 · C5.6 · C5.T9 · Download PNG

Price and Availability or Letter of Offer and Acceptance

An international partner’s can be a request for a or a . The differences between these two types of U.S. Government () responses to are outlined below.

When an asks for rather than for an , the answers it with a pricing memorandum, except for international competitions and building partner capacity [SAMM ]. A is an initial, non-binding estimate of cost and availability for planning and feasibility, and the will provide it within 30 days on the memorandum template. If the determines that a given before and approval would create a false impression, it gives a negative response instead [SAMM ]. data is prepared for international competitions and Building Partner Capacity. Neither commits the U.S. Government to offer the items [SAMM , ]. responses are not valid for preparing an , and the data compiled for an is called data () [SAMM ].

The Implementing Agencies, which are organizations and Defense Agencies, prepare data when a foreign government or international organization asks for preliminary pricing and availability for an international competition or for building partner capacity. Furnishing that data does not commit the to offer the articles and services for sale [SAMM ].

A gives the partner a general idea of the potential cost of the defense articles or services and of their availability, for planning and for assessing feasibility. and program offices will prepare the first response with funding from the administrative surcharge, consistent with the manpower policy in Table C9.T2A. If an determines that a response given before and approval is complete would create a false impression under the Department of War directive on disclosing classified military information, the will give a negative response that directs the partner to submit an for an [SAMM ].

The , addressed in C5.6 of the , is the authorized document used by the as an offer to sell defense articles, services, and training to an international partner or international organization. A is the signed basic document and the subsequent amendments and modifications [SAMM ].

The is the legal instrument the uses to transfer itemized defense articles, design and construction services, and defense services to foreign partners. When it is used under the authorities for , it is a binding agreement that both the and the foreign partner sign. The Benefitting Partner, by contrast, does not sign a Building Partner Capacity .

The case document represents a bona fide offer by the to sell the described items identified in the document. Once the purchaser signs it, the is an ; it is implemented when any required has been received and the implementing transactions have occurred [SAMM ]. While and data are both estimates, an is developed based on the international partner’s specific requirements. If logistical or financial requirements change after the case is implemented, it may be necessary to amend or modify the case.