Provisioning decides which repair parts to stock and how many of each to keep on hand to support a through its initial period of service. For a purchaser, the U.S. provisioning data for the system is adjusted to the purchaser's own operations, configuration and repair capability, a step called definitization, and the result sets the initial support delivered with the system.

What is provisioning in Foreign Military Sales?

Provisioning is the process of determining the type of repair parts to stock (or “range”) and quantity of each stocked item to have on hand (or “depth”) to support and maintain a system through its initial period of service. Except for and obsolete equipment, the Department of War (DoW) furnishes an item only when it plans to ensure logistics support for the item's expected service life, including follow-on spares support [SAMM ]. Under the , the purchaser can obtain the support articles and services required to introduce and sustain the system. The complete sustainability package must be offered when the is prepared [SAMM ]. Provisioning is used to determine all the necessary repair parts, test equipment, and other accessories such as special tools and ground support equipment. The DoW provisions each new it employs.

The provisioning conference is a working group consisting of engineering, maintenance, supply, system operational personnel, and contractor representatives. This conference is held early enough in a acquisition program to permit an orderly production of the required items. Through the use of the maintenance concept, technical drawings, parts lists, estimated prices, recommended quantities, and agreed upon replacement factors, a decision is made regarding which items will be stocked in the DoW supply system and which will be procured only on demand. It is also during the provisioning conference that the necessary information is collected to begin cataloging new items for the DoW logistics system.

The DoW logistics system is designed to provide support throughout the life cycle of a to ensure maximum mission capability. The goal is to provide the greatest support for the least cost. Decisions regarding which repair parts to stock in order to maintain the highest operational readiness possible start with the initial planning phases of a new and continue during its entire operational life. For the purposes of , the life-cycle management of a can be divided into two phases: initial support and follow-on support.

Initial support is the range and quantity of items such as tools, spares, and repair parts provided in a during an initial period of service. These items are provided to support and maintain the purchased in the [SAMM ]. Initial support is provided to the international partner before, or at the same time, the system or is delivered. This ensures the successful introduction and operation of the new system into the international partner’s inventory. Sufficient quantities of repair parts are kept on hand until follow-on support is available.

The period initial support covers varies by and is set with the purchaser, normally at a definitization conference. To determine the level required for an international partner, the U.S. implementing needs information such as the average operations per month, number of repair locations and maintenance concept [SAMM , ].

After returning from the , the logistics program manager reviews the repairable and maintenance-allowance recommendations. Part numbers, stock numbers, quantities, and supply sources are validated for subsequent ordering. The amount of support is normally based on a mutually agreed upon rate of operation for the system. Determining the type and duration of initial support is normally accomplished with a program-specific definitization conference. The U.S. recommendation for the range and depth of initial support will be based on earlier U.S. provisioning data.

are the spare parts procured to support a system logistically during its initial period of operation.

In provisioning, several decisions determine the precise level of support required. Normally, these decisions are made not only for the system as a whole but also component by component. The following concepts are considered when selecting the optimum equipment support.

As a measure of reliability, the failure rate of each constituent part is examined. One measure is the mean time between failure (MTBF). The providing is concerned about how often an item breaks down and needs replacement or repair. This information influences the type and quantity of items placed on the list.

When an item fails, the question is whether it can be restored to an operable condition according to predetermined specifications in the time allocated for its repair. Maintainability measures the ease of completing maintenance tasks. It is measured as the mean time to repair (MTTR) or restore.

In practice, the longer a is out of circulation for maintenance, the greater the quantity needed on the supply shelf. This, in turn, affects the purchasing country's inventory investment.

The capability to perform maintenance on a component presumes that the foreign nation has adequate resources, i.e., facilities, test equipment, skilled personnel, manuals, repair parts, and tools to do the job. If any one of the resources is deficient or missing, repairs to be done in country may prove impossible, thus rendering the incapable of performing its mission. On the other hand, the cost of the component, when compared to the maintenance labor costs to repair it and the cost to hold an inventory of parts, may dictate that, if the component fails it should be thrown away and replaced. For example, a small component such as a valve, motor, or pump is discarded rather than repaired when its repair costs exceed its value.

The in-country repair capability bears on the final decision regarding how many parts to buy. If such a capability exists, the quantity purchased will be lower; if not, and the items are shipped to distant repair facilities, a greater number of items is needed to compensate for the number of days the items are in the pipeline. This helps determine the amount of investment needed for spares and repair parts. The selection of parts aims at reducing downtime to ensure the can perform its designated mission in the most cost-effective manner.

In making support decisions, cost can be an overriding factor. The providing considers not just the cost of the materiel, but also labor costs for making the repairs and the cost of not having the available while repairs are being made. The lowest cost of parts is not necessarily the most economical cost. Standardization and interchangeability also enter into the economics equation. Selecting parts common to systems in use can avoid inventory costs and support difficulties.

Once an item of equipment or component is found to be repairable, the recipient country decides at which level in its overall maintenance organization the repair will be made. Three different levels of repair are usually considered:

  • Organizational repair that is done by the using organization, i.e., company, squadron, or shipboard levels
  • Intermediate repair, usually at an echelon above and supporting the organizational level, but still operating in the field, such as base, battalion, station or division levels
  • Depot-level maintenance, usually performed in a military depot or a contractor’s plant

The decision to repair at the organizational, intermediate, or depot level is made after considering the technical skills of the personnel at each level, the investment in special tools, test equipment, facilities or handling devices which may be required, and any problems in physical access to the equipment that may be encountered.

Since having unlimited funds to secure support items is not usually the case, it is necessary to allocate available resources on the basis of military essentiality. Military essentiality is the relative value of each part to the equipment and the equipment to the system as a whole. Parts become more essential when their individual performance directly affect the entire system. The failure of some part or equipment will prevent a from performing its total mission. Military essentiality guides the allocation of funds toward the most critical items, those whose failure would have the greatest impact on the ability of the equipment to accomplish its designated mission.

The DoW provisions each by identifying its maintenance intervals, component characteristics, military essentiality and levels of repair, so that logistics managers can procure and stock the items most critical to supporting the system.

Definitization is the process by which the provisioning requirements for the U.S. are adjusted to accommodate those of the international partner. The definitization process is essentially the same for as is the provisioning process for new systems procured for U.S. forces. However, because definitization tailors a standard U.S. system, the U.S. operation, maintenance, and consumption data are the foundation for making adjustments for the international partner’s projected requirements. During the operation of a , the database created during provisioning is updated continuously to reflect actual usage and to modify the theoretical decisions, which were originally assumed. This updated database becomes the basis for determining what types of support should be included in the total package transferred to an international partner.

The configuration being sold may differ from the standard U.S. model. In some cases, there are components, which cannot be sold to other nations for security reasons or to protect sensitive technologies. In such instances, these are replaced, possibly with components not used by U.S. forces. In other cases, a country’s special needs or operational considerations call for some modification to the standard configuration. In either instance, the configuration changes are identified in the definitization process, and the logistics support is modified accordingly. The definitization process includes planning for follow-on support.

The support infrastructure of the international partner has a bearing on the support package. The number of operating bases and supply depots and their locations can change the U.S. recommendations. The location and use of repair facilities are especially important. Components of more sophisticated equipment can be more economical to repair than to purchase new. A purchasing country that does not have the capability to repair such items returns them to U.S. repair facilities. Its in-country stocks of repairable items then need to be higher to cover the longer loop in the repair cycle while items are being returned to the U.S. The alternatives for reducing initial and life-cycle support costs through increased self-sufficiency and a shorter supply and maintenance pipeline should be presented as options to the international partner.

The overall objective of definitization is to provide optimum logistics support, at a reasonable cost, using the best possible calculations of projected needs. Definitization tailors the support to the system being purchased, so the international partner does not rely on unreviewed U.S. data alone.

Definitization extends the DoW provisioning process. It tailors a standard DoW system to the international partner's operational requirements by adjusting the logistics support package, the item configuration, and the kind and quantity of spare parts.