FMS EdgeFMS Edge — home

Guide

How long does a purchaser have to accept a Foreign Military Sales Letter of Offer and Acceptance?

Updated 26 October 2026Checked against the SAMM: 2 November 2026

The is normally 85 days after Approval is posted in the Defense Management System, except for countries approved a longer period. The date may be extended without restating the case if the extension is requested within 6 months after it expires and the manual's other conditions are met. A short date should not be used to justify prioritizing a document.

How long does a purchaser have to accept a Letter of Offer and Acceptance?

The is normally computed as 85 days from the Approval () milestone in the Defense Management System (). This period is generally based on time for U.S. administrative processing and for international partner review. Countries that have been approved a longer are the exception [SAMM ].

Unless the purchaser asks for an extension and the U.S. Government grants it, the offer terminates on the [SAMM ]. A purchaser may also ask the applicable , countrywide or case by case, for an longer than the approved timeframes; if the concurs, it records the longer in a case remark and forwards it to the 's Strategy, Plans, and Policy Directorate ( (SPP)) for approval [SAMM ]. Normally, the greater the period of time between offer and acceptance, the greater the likelihood of decreased accuracy of the data [SAMM ].

Short are used for U.S. Government-driven requirements, for example where the price estimates depend on by a certain date. If a short leaves the purchaser less than the standard period for its review, the must include the mandatory short note. A short should not be used to meet a purchaser-driven need, or to move an document faster through review and countersignature [SAMM ].

A short should not be used as a reason to prioritize the processing of an document. Prioritization should be requested only where there is a compelling reason to offer the document in less than the normal processing time, and Building Partner Capacity () should follow similar guidelines [SAMM ].

The may be extended without restating the case only if three conditions are met: the extension is requested within 6 months after the current valid expires, the document has not been cancelled (Section C5.6.11.9.2), and the has completed a review confirming that the data remain valid for the extended period. Everyone concerned should be advised of any consequences of the extension. Any minor changes (Section C5.6.12.2) and changes in Months () that the extension causes are also updated, and payment schedules can be updated only to match the changes (Section C5.6.12.3) [SAMM ].

The period from the offer to the purchaser's acceptance, which the manual calls partner review for management and tracking, is a measurement interval rather than a separate phase, and it is one of the authoritative metrics of the case lifecycle that Appendix 11 lists [SAMM ].

Try the tool: Offer expiration and first payment

References

SAMM

Related