How is a Supply Discrepancy Report submitted and resolved?

Updated 26 October 2026Checked against the SAMM: 26 October 2026

Before reporting a suspected discrepancy, the purchaser should check it against the time limit, the minimum value and its cause. The report goes on a Standard Form 364 or an electronic equivalent, with its supporting documents, to the of the service managing the case, and that office edits it and passes it to the supply source. The , with the supply source, resolves the report and decides financial responsibility, and an approved report is settled by a financial credit, a repair or a replacement item.

How is a Supply Discrepancy Report submitted and resolved?

The purchaser reports a supply discrepancy to the appropriate ’s on a Standard Form (SF) 364, [SAMM , ]. The , together with the Department of War (DoW) or commercial supply source, resolves the and determines financial responsibility [SAMM ].

To determine if a suspected discrepancy should be reported, a step-by-step process is recommended, which involves the elements of time, value, and determination of the cause of the discrepancy.

The international partner should inspect each delivery upon receipt to ensure that the correct item is received in the correct amount and in good condition.

The Standard Terms and Conditions, Section 5.4, set the time limit [SAMM ]. The U.S. Government () disallows a late claim unless it determines that unusual and compelling circumstances involving latent defects justify its consideration [SAMM , ]. The time limit allows the international partner time to receive, inspect, and, if necessary, test the materiel. It does not constitute a warranty, but rather allows the international partner to assemble the necessary documentation to support a claim for a discrepancy. A latent defect is one that exists at the time of acceptance but cannot be identified by a reasonable inspection.

For a , the purchaser agrees to submit an within one year after the end of the service’s scheduled period of performance [SAMM ]. The will disallow an for non-shipment or non-receipt received later than one year after the scheduled delivery date or the initial billing, whichever is later. A claim received after that year may still be considered to the extent that the actual delivery came later than the scheduled date [SAMM ].

Time limits for reporting discrepancies under contractor warranties are set in the individual warranty clauses, the contracts, or both. The purchaser must submit within the contractor warranty timeframe, even when the warranty ends less than a year after delivery of the defense articles or passage of title to them [SAMM ]. The same holds for a whose warranty ends less than a year after its scheduled period of performance [SAMM ].

Next, the international partner should determine if the suspected discrepancy is, in fact, valid. are processed only when the estimated value is $200 or greater, except for misdirected or unordered shipments. This minimum value includes the value of the item plus any transportation and handling costs. International partners may submit regardless of the dollar value so that problems can be documented, but only those over the minimum dollar value are reviewed for possible compensation [SAMM ].

That minimum value applies whatever the type of discrepancy, except for misdirected or unordered shipments [SAMM ].

Either the shipper () or the carrier resolves a reported discrepancy.

If the discrepancy is a shipper or billing responsibility, an should be prepared and forwarded to the appropriate for initial processing [SAMM ].

The SF 364, , is the document used in reporting selected discrepancies to the . Instructions for SF 364 completion, DoW processing time frames, and responsibilities are located in Defense Logistics Management (DLM) 4000.25, Defense Logistics Management Standards (), Volume 2, Chapter 17. The process is not applicable to Building Partner Capacity () cases [SAMM , ]. The requirement for the international partner to submit reports of discrepancy on an SF 364 is included in the conditions of each negotiated with the country. International partners may use the to submit electronically instead of using the SF 364.

The U.S. may assist the international partners in articulating the discrepancy so that it is understandable by the [SAMM ]. However, the has no role in accepting or adjudicating the on behalf of the international partner or .

materiel that is confirmed to be missing will be reported by the on a Transportation Discrepancy Report () [SAMM ].

The SF 364 along with a copy of all applicable documentation should be forwarded to the of the military service managing the . Electronic submission of the via , or some other electronic medium, will speed up the investigation process. Photographs of materiel as received, which involve damaged or mislabeled materiel, should be attached to the SF 364 or uploaded along with the electronic as evidence to substantiate the claim. If available, other documents that should accompany the SF 364 include copies of the DD Form 1348-1A, Issue Release/Receipt Document; DD Form 250 or Wide Area Workflow (WAWF) electronic equivalent, Material Inspection and Receiving Report; and any previously received status reports, bills of lading, drawings, and any other related documents that support the .

Any movement document or receipt counts as evidence of shipment if a carrier representative has signed it and it shows that the United States shipped or released the materiel to a carrier for onward shipment to the country's designated representative. Such documents generally show the date, the addressee, the quantity and the . They generally also show the , the , the vessel, voyage or flight number where possible, the number, the bill of lading, parcel post insured or registered number, and the names of the shipper and carrier. This information is essential when are adjudicated. When proof of delivery to a carrier is asked for and the consignee copy of the bill of lading has not reached the , the purchaser's representative gets a duplicate of the appropriate documents that establish evidence of shipment [SAMM ].

When an is received from an international partner, the acknowledges receipt to the international partner. The receiving activity then makes an initial edit of the for proper format, and a second edit against the management information system. If correct, the is recorded, entered into the processing system, and forwarded to the appropriate or shipping activity for further processing. If the initial edit by the reveals that the was submitted in error, e.g., not in accordance with the conditions on the or was submitted with insufficient information for processing, the is rejected with the reason(s) indicated.

The should respond to an accepted within the timeframes established in DLM 4000.25, Volume 2, Chapter 17 [SAMM ]. If an international partner’s request for compensation under this procedure is denied by the concerned, i.e., an unfavorable finding, the international partner may request reconsideration by resubmitting the within the time the manual allows. A copy of the original , annotated to indicate that it is a resubmission along with all supporting documentation, is resubmitted to the . The international partner should include a cover letter explaining why the original finding is thought to be incorrect. If the international partner remains dissatisfied with the second response, the may be resubmitted a third time. A third submission is normally accomplished only if there is additional documentation to support the claim.

The appropriate or shipping activity of the source of supply provides the reply to the .

Compensation for an approved may be in the form of a financial credit, a repair service, or a replacement item [SAMM ]. If the discrepancy was for a lost, damaged, or incorrect item, the international partner may request a replacement item. In that case, the will coordinate with the to ship a replacement asset without having the international partner reorder the item. If the discrepancy is financial, the will coordinate with the Defense Finance and Accounting Service () to take appropriate financial action on the international partner account. The billing statement furnished to the international partner on a quarterly basis (DD Form 645) will reflect such financial adjustments. If the discrepancy involves a quality or performance defect, the may determine that repair services are the most appropriate method to resolve the discrepancy.

approval of an is required when the determines that the is liable for correction of the discrepancy and recommends use of funds in excess of $50,000, or when the involves an issue likely to be raised to [SAMM ].

Whenever discrepant materiel is to be returned to U.S. custody, the purchasing country will be directed to reship the materiel using the same document number under which the materiel was originally shipped.

For discrepant materiel other than classified or and arms, arms parts or explosives, the purchaser agrees to ship the articles within 180 days of receiving U.S. Government direction for the return [SAMM ].

Upon evidence of materiel being returned, a credit adjustment will be processed for the return of the discrepant materiel if previously authorized. This evidence releases the international partner of liability for the materiel.

In the case of misdirected or unordered classified or , or arms, arms parts or explosives, the purchasing country ships the materiel within 30 days of direction for the return [SAMM ].